top of page

MOL

2023.  Reconstruction of the MOL gas station in Mojsinje near Čačak, MOL Serbia doo, Belgrade, Reconstruction of the pump according to the Framework Agreement MOL - Alfing

 

2021. Rebranding  g.s. MOL   in Loznica

Investor: MOL Serbia d.o.o.

2021. Reconstruction g.s. MOL  Reconstruction of the toilet  in Presevo

Investor: MOL Serbia d.o.o.

2021. Reconstruction g.s. MOL  Making new ceilings on g.s. MOL Presevo, Jagodina and Markovac

Investor: MOL Serbia d.o.o.

2021. Reconstruction g.s. MOL  Production of vertical signalization on the highway for g.s. MOL Horgos 1 and 2, Rumenka 1 and 2, Batrovci 1 and 2 and Markovac

Investor: MOL Serbia d.o.o.

2020. Rebranding  g.s. MOL   in Crvenka

Investor: MOL Serbia d.o.o.

2020. Rebranding  Fluks / MOL   at Konjarnik in Belgrade

Investor: FLUKS d.o.o.

2019. Work is underway on the advertising pillar of the MOL Petrol Station in Markovac

 

2019.  Rebranding g.s. MOL in Svilajnac
Investor:  MOL Serbia doo , Belgrade Reconstruction of the pump under the MOL Framework Agreement - Alfing


2018.  Rebranding g.s. MOL-2 in Kragujevac
Investor:  MOL Serbia doo , Belgrade Reconstruction of the pump under the MOL Framework Agreement - Alfing


2018. Rebranding g.s. MOL in Sabac
Investor:  MOL Serbia doo , Belgrade Reconstruction of the pump under the MOL Framework Agreement - Alfing


2016.  Rebranding g.s. MOL ''Piramida'' in Novi Sad
Investor: MOL Serbia doo , Belgrade Reconstruction of the pump under the Framework Agreement


2016.  Rebranding g.s. MOL in Kragujevac
Investor:  MOL Serbia doo , Belgrade Reconstruction of the pump under the MOL Framework Agreement - Alfing


2015. Awning on g.s. MOL '' Horgos 1 '', in Horgos
Investor:  MOL Serbia doo , Belgrade


2014.  Rebranding g.s. MOL '' Medakovic '', Belgrade
Investor:  MOL Serbia doo , Belgrade Reconstruction of old pumps - rebranding on b.s. Medakovic will be just the beginning for several of the same deals with the same Investor. The result of the trust will be the Framework Agreement on Architectural and Construction Work for MOL, which has been extended twice to this day

2013. Building a g.s. MOL '' Juzni Bulevar'', with retaining wall h = 7 m, l = 50 m, Belgrade
Investor:  MOL Serbia doo, Belgrade Contractor (Alfing) made a new pump for MOL, including a sales facility and a canopy with a plateau. In a small space, the building is constructed with a large retaining wall without any damage to the old residential building right next to the wall

2006/7  Construction of g.s. MOL "Kraljevo" in Kraljevo
Investor: INTERMOL doo, Belgrade A new parking pump was built in a record 75 days in the winter. Cooperation with foreign companies that built the above ground part of the building and the interior was well coordinated. The earthquake in Kraljevo in 2010 did not damage no part of the construction, installation or plateau pump as defined by the Commission MOL s


2005/6  Construction of g.s. MOL "Krnjaca" in Belgrade
Investor INTERMOL doo, Belgrade  
A new parking pump was built in 3 months on the ground with high groundwater level. The placement of 100-ton tanks with groundwater levels was 'routine' with 'iglofilters'. The cooperation with foreign companies that built the above ground part of the building and the interior was well coordinated


2005. Reconstruction of g.s. MOL "City oil" , Visnjica in Belgrade
Investor INTERMOL doo, Belgrade  
Reconstruction of the Pumped Storage Facility was the first job for the Investor. Quality of work and adherence to deadlines will assure MOL investors that Alfing will be a contractor to this day

bottom of page